One of the first questions founders ask is simple: “How long will it take to build our MVP?”
For most early-stage products, the goal is speed, clarity, and early validation. As an agency, we focus on delivering a functional, lean MVP fast — often in 1 to 4 weeks depending on complexity.
Below is a clear timeline of what the process includes and how long each phase typically takes.
Our MVP process is streamlined. We skip long discovery cycles and focus on building the core functionality as quickly as possible.
A short preparation phase where we clarify requirements, define the scope, and confirm the features for the first release.
A simple, focused outline of what the MVP must include. We prioritize the smallest set of features that deliver real value.
Quick layout sketches or low-fidelity mockups to align on flow before development starts.
This is the core of the timeline. The exact duration depends on the number of screens, business logic, integrations, and complexity.
Building the user-facing interface, forms, components, dashboards, and interactions.
APIs, authentication, core logic, admin panels, and database connections.
Simple backends move fast. More complex logic adds time.
Schema planning and cloud configuration.
Payments, analytics, messaging APIs, AI features, or other external tools.
Some integrations take a day. Others require testing and custom logic.
Functional testing, bug fixes, and final polishing.
Most simple MVPs finish within 1–4 weeks end-to-end.
This prepares your MVP to go live and start collecting real user feedback.
Production servers, domains, security, and setting up hosting.
Mobile apps may need store submission time.
Basic tracking, onboarding emails, and tools to gather user insights.
More features and screens mean more time. The tighter the scope, the faster the delivery.
Simple layouts move quickly. Custom or animated interfaces increase the timeline.
Payment systems, CRMs, AI features, or scheduling tools add setup and testing time.
Clear direction speeds up development. Unclear or shifting requirements slow it down.
For most agency-built products:
Ultra-simple MVP: 1 - 2 weeks
Standard MVP: 2 - 4 weeks
Feature-heavy MVP: 4 - 6 weeks
These ranges cover the majority of early-stage products we build.
A fast MVP lets you learn quickly, test with real users, and avoid wasting months on assumptions.
With the right scope, team, and focus, an effective MVP can be shipped in 1 to 4 weeks.